Difference between revisions of "Step Complete"
Line 1: | Line 1: | ||
− | + | =='''Step Complete and Inspector Confirmation '''== | |
The Step complete and Inspector Confirmation tick boxes allow monitoring and reporting of progress<br> | The Step complete and Inspector Confirmation tick boxes allow monitoring and reporting of progress<br> | ||
Line 11: | Line 11: | ||
[[File:Stepkey.PNG]]<br> | [[File:Stepkey.PNG]]<br> | ||
− | Additionally anything that is 'Inspector confirmed' on a given day is reported in the daily report < | + | Additionally anything that is 'Inspector confirmed' on a given day is reported in the daily report <br> |
+ | |||
+ | =='''Confirmations'''== | ||
+ | The two two boxes can be used to monitor progress <br> | ||
+ | As each step is completed the contractor (or his designated person) confirms by selecting the 'Step Complete' tick box; once confirmed the only the contractor can deselect this box<br> | ||
+ | The second box 'Inspector Confirmation' is used by the Client or Third Party Inspector to confirm works are to the required standard and can be progressed to the next step | ||
+ | |||
+ | [[File:current3.png]]<br> | ||
+ | once you have selected the required Inspection ID the inspection form opens as below <br> | ||
+ | [[File:current4.png]]<br> |
Revision as of 10:51, 22 November 2017
Step Complete and Inspector Confirmation
The Step complete and Inspector Confirmation tick boxes allow monitoring and reporting of progress
Step Complete confirmation is normally selected by the Contractor; this advises the Client Inspector that the step is ready for inspection
Once each step is confirmed by the Inspector, a set percentage of the inspection report total surface area is entered into the Step Complete Report.
eg if the Inspection Report total surface area is 10square metres and the pre ctreatment step is confirmed as complete by the inspector then 10% of the
surface area is calculated for the days progress
Percentages for each stage are predetermined as the table below but can be adjusted to suit each Client individually
Additionally anything that is 'Inspector confirmed' on a given day is reported in the daily report
Confirmations
The two two boxes can be used to monitor progress
As each step is completed the contractor (or his designated person) confirms by selecting the 'Step Complete' tick box; once confirmed the only the contractor can deselect this box
The second box 'Inspector Confirmation' is used by the Client or Third Party Inspector to confirm works are to the required standard and can be progressed to the next step
once you have selected the required Inspection ID the inspection form opens as below